• Home
    • V&R Solutions
  • Products
    • POM Applications Suite
    • POM
    • OPM
    • BOR
    • PCM
    • POM-PS
    • POM-TS
    • FFS
    • BOR-TS
    • POM-RT
    • ROSE
  • Services
  • Smart Grid Solutions
  • Support
  • News and Events
  • Contact V&R
  • Downloads
  • Forum
  • About V&R
Site Menu
  • Home
    • V&R Solutions
  • Products
    • POM Applications Suite
    • POM
    • OPM
    • BOR
    • PCM
    • POM-PS
    • POM-TS
    • FFS
    • BOR-TS
    • POM-RT
    • ROSE
  • Services
  • Smart Grid Solutions
  • Support
  • News and Events
  • Contact V&R
  • Downloads
  • Forum
  • About V&R
Related Links
    • IEEE Smart Grid
    • AWEA
    • NYSERDA
    • NRECA
    • NERC
    • IEEE PES
    • FERC
    • EPRI
    • Dept. Of Energy
    • CEATI
    • IEEE Spectrum
    • NASPI
V&R Energy
UTC Top Utility Solutions 2011



  • Forgot your password?
  • Forgot your username?
  • Create an account

V&R Energy: BOR Transient Stability (BOR-TS) - Dynamic Security Region

Print | E-mail

BOR-TS is a friendly, flexible and easy-to-use program to automatically generate nomograms.

While having all the features and functionality of BOR, BOR-TS allows the user to monitor both transient and steady-state limits. Monitored limits incorporated in BOR-TS are:

  • Transient stability limit 
  • Steady-state stability limit
  • Thermal limit
  • Voltage range/drop limit

Different criteria may be used in BOR-TS to specify transient stability limit; for example, angular (first swing) stability may be considered as a transient stability constraint.

The system is secure under such operating conditions (such sets of injections) that no steady-state or transient stability constraints are being violated. This is the dynamic security region of a system.

  bor-ts

Operating within the stability boundary is secure. Each point on the stability boundary corresponds to at least one of the steady-state or transient constraints being violated.

BOR-TS is a fast and effective tool for planners and operators.

 PR: wait...  I: wait...  L: wait...  LD: wait...  I: wait... wait...  Rank: wait...  Traffic: wait...  Price: wait...  CY: wait...  I: wait...  YCat: wait...  I: wait...  Top: wait...  C: wait...
< Prev   Next >
 
Copyright © 1997-2012 V&R Energy Systems Research, Inc. All rights reserved.

V&R Energy Systems Research, Inc